Finished basement with an open living area, recessed lighting and a staircase to the main floor

Turn your basement into a legal rental suite把地下室改造成可以合法出租的独立单元

ARVO Reno designs, permits and builds legal basement apartments across the GTA, from the first measurement to permit closure.ARVO Reno 为 GTA 业主提供地下室合法出租单元的设计、报批与施工,从第一次测量一直负责到许可关闭。

Drawings by BCIN-qualified designers. Permit filed, inspected and closed by ARVO.图纸由 BCIN 资质设计师出具,报批、检查到许可关闭由 ARVO 负责。

Winter turn-key package冬季交钥匙套餐

From $29,980 + HST$29,980 起 + HST

  • Permit drawings, submission and City liaison报批图纸设计、递交及与市政府沟通
  • Built to permit, through final inspection按许可施工,直至通过验收
  • 1-year warranty一年保修
Get this package咨询此套餐
Package terms套餐条款

Price excludes HST and City permit fees. Applies to basements up to 650 sq ft; larger areas and added work, such as a separate entrance or egress windows, are quoted separately. Subject to a feasibility assessment. Offer valid until March 31, 2027.价格不含 HST 及市政府许可费。仅适用于 650 呎及以下的地下室;超出面积或增加分门、逃生窗等其他服务,按实际报价。以可行性评估为准。优惠截至 2027 年 3 月 31 日。

Finished is not the same as legal装修过,不等于合法

Many GTA basements have a kitchen, a bathroom and a tenant, but were never built or inspected as a second unit.GTA 很多地下室有厨房、有卫生间、也有租客,但从未按第二单元施工和检查。

ItemFinished basement已装修的地下室Legal second unit合法第二单元
Building permit建筑许可Often none, or a permit for a rec room only通常没有,或只是娱乐室的装修许可Issued for a second unit, inspected, closed按第二单元申请,经检查并关闭
Fire separation防火分隔Regular drywall with gaps普通石膏板,有缝隙Rated ceiling, walls and door, openings sealed天花、墙体和门达到耐火等级,开口封堵
A way out逃生出口Through the house, or a small window穿过主屋,或一扇小窗Egress windows and a code-compliant exit合规的逃生窗和出口
Alarms报警器Battery alarms电池式报警器Interconnected smoke and CO alarms联动的烟雾及一氧化碳报警器
Electrical电气Work of unknown age and quality来源和质量不明Inspected by the ESA经 ESA 检查
Renting出租Enforcement and insurance risk面临执法和保险风险Can be disclosed to insurers, lenders and buyers可以如实告知保险公司、贷款机构和买家

Check your basement in a minute一分钟地下室自测

Six questions. You'll see what looks straightforward and what we'd need to look at on site.六个问题,看看哪些条件已经具备,哪些需要现场确认。

Measure the height from the floor to the finished ceiling, not to the joists.层高请从地面量到完成后的天花,而不是楼板龙骨。

Which city is the house in?房子在哪个城市?
What type of home is it?房屋类型?
Floor to ceiling height in the basement?地下室地面到天花的高度?
Is there a separate entrance to the basement?地下室有独立入口吗?
Could an adult climb out of the bedroom windows?成年人能从卧室窗户爬出去吗?
What is the basement like now?地下室目前的状况?

From first measurement to permit closure从第一次测量到许可关闭

One team and one contract for design, permit and construction.设计、报批、施工由同一个团队负责,签一份合同。

  1. 1

    Feasibility assessment可行性评估

    We measure the basement, check zoning, and list what has to change. You get an itemized estimate.上门测量、核查分区,列出需要改动的地方,并给出分项预算。

  2. 2

    Architectural design建筑设计

    Layout, egress, entrance and fire separation drawn together, so the plan works for tenants and for the inspector.平面布局、逃生、入口和防火分隔一起设计,既适合租客使用,也满足检查要求。

  3. 3

    Zoning and code review分区与规范审查

    We check the drawings against the city's zoning by-law and the Ontario Building Code before anything is filed.提交前,按市政分区条例和安省建筑规范逐项核对图纸。

  4. 4

    Building permit application申请建筑许可

    BCIN-qualified drawings submitted by us. We answer the examiner's comments.由我们提交 BCIN 资质设计师出具的图纸,并回复审图意见。

  5. 5

    Fire separation and egress防火分隔与逃生

    Rated ceilings and doors, egress windows and window wells, a separate entrance where needed.防火天花和防火门、逃生窗及窗井,必要时增设独立入口。

  6. 6

    Plumbing, HVAC and electrical水、暖通与电气

    Licensed trades for plumbing, ventilation, electrical and alarm interconnection, with an ESA inspection.持牌技工完成给排水、通风、电气和报警器联动,并通过 ESA 检查。

  7. 7

    Renovation and finishes装修施工

    Kitchen, bathroom, flooring and finishes chosen for durability in a rental.厨房、卫生间、地板与饰面,选材以出租耐用为原则。

  8. 8

    Final inspection and permit closure最终验收与许可关闭

    We book the final inspection and see the permit through to closed.我们预约最终验收,直到许可正式关闭。

Common problems, and how we solve them常见难点与解决办法

  • Ceiling too low层高不够

    Reroute ducts and bulkheads first. If that isn't enough, the floor is lowered with underpinning or bench footings.先调整风管和包管;仍不够时,通过托换基础(underpinning)或台阶式基础(bench footing)降低地坪。

  • Windows too small窗户太小

    Cut a larger opening and add a window well, so every bedroom has a window you can climb out of.扩大窗洞并加装窗井,确保每间卧室都有可以爬出的逃生窗。

  • No separate entrance没有独立入口

    A side or rear walk-down entrance is common. Where the layout allows, a protected shared exit can work instead.常见做法是在侧面或后面增设下沉式入口;布局允许时,也可以采用受保护的共用出口。

  • One furnace, shared ducts共用一台炉子和风管

    Ductwork is detailed so smoke can't travel between units, or each unit gets its own system, depending on the house.根据房屋情况,对风管做防烟处理,或为每个单元配置独立系统。

One lot, three homes一块地,三个家

Ontario allows up to three units on most serviced residential lots: the main house, a basement suite and a garden suite. ARVO designs and builds both additions, and checks the zoning for them together.安省允许大多数有市政配套的住宅地块建最多三个单元:主屋、地下室单元和后院花园屋。两种加建 ARVO 都可以设计和施工,并同时核查分区要求。

Main house主屋 Basement suite地下室单元 Garden suite花园屋

Finished basement suites地下室完工效果

Living space, kitchens, bedrooms with egress windows, and bathrooms. Select a photo to enlarge it.起居空间、厨房、带逃生窗的卧室和卫生间。点击照片可放大查看。

Suite living area and kitchen单元起居区与厨房
Kitchen with in-suite laundry厨房与独立洗衣
Bedroom with egress window and window well带逃生窗和窗井的卧室
Bathroom with glass shower玻璃淋浴间卫生间
Bathroom with walk-in shower步入式淋浴卫生间
Family room with wet bar带水吧台的家庭厅
Media room影音室
Living room with fireplace wall壁炉背景墙起居室

Questions homeowners ask业主常见问题

What makes a basement apartment legal in Ontario?在安省,什么样的地下室出租单元才算合法?
It is allowed by zoning, built under a building permit, meets the Ontario Building Code requirements for a second unit (fire separation, a way out, ceiling height, smoke and CO alarms, among others), passes inspections, and the permit is closed. Ontario's rules now allow up to three residential units on most serviced residential lots, so in most GTA neighbourhoods the question is whether your particular basement can meet the code.需要同时满足:分区规定允许、在建筑许可下施工、符合安省建筑规范对第二单元的要求(防火分隔、逃生出口、层高、烟雾和一氧化碳报警器等)、通过各阶段检查,并完成许可关闭(permit closed)。安省现行规定允许大多数有市政配套的住宅地块建最多三个居住单元,因此在 GTA 大多数社区,关键问题是您家的地下室本身能否达到规范要求。
My basement is already finished. Does it all have to come out?地下室已经装修过了,需要全部拆掉吗?
Usually not. Some areas often need to be opened so the inspector can see framing, wiring, plumbing and insulation, and the ceiling between units typically needs fire-rated drywall and sealed openings. We look at what can stay during the feasibility assessment.通常不需要。一般要局部打开墙面或天花,让检查员查看结构、电线、水管和保温;两个单元之间的天花通常需要换成防火石膏板并封堵开口。哪些可以保留,我们在可行性评估时会逐项判断。
How long does it take?整个流程需要多长时间?
Permit review time depends on the city and on how complete the drawings are when they are submitted. After the feasibility assessment we give you a schedule for your project, covering design, permit and construction.审批时间取决于所在城市以及提交图纸的完整程度。完成可行性评估后,我们会给出针对您项目的时间表,涵盖设计、报批和施工三个阶段。
What does it cost?费用大概多少?
The biggest cost drivers are lowering the floor if the ceiling is too low, cutting in egress windows, adding a separate entrance, and separating heating, ventilation and plumbing. A basement that already has good height and an entrance costs far less. The feasibility assessment ends with an itemized estimate.主要的费用来自:层高不足时降低地坪、开挖新的逃生窗、增加独立入口,以及分隔暖通和给排水系统。层高够、已有入口的地下室费用会低很多。可行性评估结束时,我们会给出分项预算。
Who prepares the drawings and the permit application?图纸和报批由谁负责?
Drawings are prepared by BCIN-qualified designers. We submit the application, answer the plans examiner's comments, and book the inspections through to permit closure.图纸由 BCIN 资质设计师出具。报批申请由我们提交,审图意见由我们回复,各阶段检查也由我们预约,直至许可关闭。
Can I have a basement suite and a garden suite?可以同时做地下室单元和后院花园屋吗?
On many GTA lots, yes: a main house, a basement suite and a garden suite can add up to the three units the province allows. We check the zoning for both at the same time, since that is also what ARVO builds in the backyard.在很多 GTA 地块上可以:主屋、地下室单元加花园屋,正好是省里允许的三个单元。我们会同时核查两者的分区要求,后院花园屋本身也是 ARVO 的主营业务。
Do you work in Chinese?可以用中文沟通吗?
Yes. Consultations, drawing reviews and site meetings can be in English, Mandarin or Cantonese.可以。咨询、图纸讲解和现场沟通都可以使用英文、普通话或粤语。

Tell us about your space说说您的项目

A short description is enough to start. We reply within one business day, in English, Mandarin or Cantonese.简单描述即可,我们会在一个工作日内用英文、普通话或粤语回复您。

  • Email邮箱hello@arvosuites.com
  • Drawings图纸Prepared by BCIN-qualified designers由 BCIN 资质设计师出具
  • Service area服务区域Toronto and the GTA多伦多及大多伦多地区

Your basement self-check answers will be attached to this request.您的地下室自测结果将随本次咨询一起提交。

We use your details only to reply to this request.您的信息仅用于回复本次咨询。